This email address is being protected from spambots. You need JavaScript enabled to view it.         (+44) (0) 1430 431 522

Our contracting arm undertakes the work that we have developed with you as part of the consultancy process. We believe this is an important factor that is missing in the traditional consultant-client-contractor relationship and allows value for money to be achieved, as well as a quality outcome. The site element of a project must work alongside, as well as following on from, the design, consultation, planning and licensing stage of a project.  The continuity of involvement between the designer and contractor allows the project to develop on site if necessary as conditions are found which could not be foreseen.

To ensure the correct mitigation, habitat improvements and management are implemented there needs to be a consistent approach. Environments for People has extensive experience of designing, installing and monitoring barrier fences for protected species such as great crested newts.

Pond and lake development and maintenance is a speciality of ours - whether it be the management or restoration of an existing pond or the construction of new ones. We assess the value and condition of a pond before undertaking any management. New ponds, if not dug into non-permeable soils can be lined with a high quality low maintenance membrane and left to fill with rain water. The design and location are very important to ensure that wildlife colonises the pond. Starter pond plants are obtained from reliable UK aquatic plant nurseries and added if required. In some cases planning and licenses may be required for the construction of a pond and we can undertake this as part of the whole package.

Environments for People are leading designers and installers of innovative structures made from recycled plastic products. These include boardwalks, cycleways, fishing pegs, dipping platforms, seats and even bridges. The recycled plastic needs very little maintenance, and does not rot. As Approved Installers of Centriforce recycled plastic products, we can offer a design through to construction service, producing 3D drawings to give a clear visual impression of what the structure will look like, providing cutting and costs lists, working with volunteers or your labour to install or simply supplying plans and materials.

To complement our work on ponds and lakes, we are able to offer services to design, construct and manage wetlands and ditches taking into account the requirements of the environment as well as flooding and water storage.

We also undertake other site management works including gates, benches, interpretation boads, paths, meadow establishment to offer a whole site managment service.

With many years’ experience of practical project delivery we can ensure that the most innovative design, cost effective materials, techniques, and delivery are used to bring your project in on budget, ensuring all permissions and licences are in place and adhered to.

Contact Environments for People today   Contact Now